深基坑挡土支护钻孔灌注桩设计方法 |
点此下载全文 |
引用本文:冯玉国.深基坑挡土支护钻孔灌注桩设计方法[J].钻探工程,1996,(3):14-17.. Method of Designing Bored Pile Walls for Deep Foundation Pit Retaining[J]. Drilling Engineering, 1996,(3):14-17. |
摘要点击次数: 1075 |
全文下载次数: 316 |
冯玉国 |
山东岩土工程勘察总公司 |
|
中文摘要:在高层建筑深基坑挡土支护中,用锚杆拉结钻孔灌注桩作挡土墙是近年来应用的主要方法之一。以烟台龙睛大厦深基坑挡土支护为例,介绍了用锚杆拉结的钻孔灌注桩设计方法。 |
中文关键词:深基坑挡土支护,钻孔灌注桩,锚杆,设计方法 |
|
Method of Designing Bored Pile Walls for Deep Foundation Pit Retaining |
Feng Yuguo |
|
|
Abstract:Bored piles braced together by anchorsto constuct the retaining wall is one of the main methods applied in deep foundation pit retaining supportfor high-rise buildings. The design method of anchor-braced bored piles is described with reference to thedeep fondation pit retaining support for Yantai Longjing Building. |
keywords:deep foundation pit retaining support bored pile anchor design method, |