复杂条件多工艺联合深基坑支护技术
  修订日期:1998-04-21  点此下载全文
引用本文:黄常波,张生德,陈宏,张小波.复杂条件多工艺联合深基坑支护技术[J].钻探工程,1999,(1):29-31.
. The Deep Foundational Pit Supporting Technique by Combination of Multiple Processes in Complex Condition[J]. Drilling Engineering, 1999,(1):29-31.
摘要点击次数: 919
全文下载次数: 329
黄常波  张生德  陈宏  张小波
Huang Changbo,Zhang Shengde (China University of Geo sciences,Wuhan,430074)
,Chen Hong,Zhang Xiaobo (Hubei Hualong Special Foundation Engineering Company Ltd.,Wuhan,430030)
中文摘要:在复杂条件下,采用钻孔灌注连排桩、连排桩间高压喷射注浆桩和地下连续墙3种工艺联合,进行深基坑支护,在施工过程中注意质量控制,取得了好的支护效果。
中文关键词:深基坑支护,钻孔灌注连排桩,摆喷桩,旋喷桩,地下连续墙
 
The Deep Foundational Pit Supporting Technique by Combination of Multiple Processes in Complex Condition
Huang Changbo  Zhang Shengde
Abstract:The combination of conjunct bored piles, high pressure jet grouting and diaphragm wall is an effective approach to support the deep foundational pit in complex condition.
keywords:deep foundational pit supporting, conjunct bored piles, swing jet grouting pile, directional jet grouting pile, diaphragm wal,
查看全文  查看/发表评论  下载PDF阅读器