托换技术在地勘坑道沉降区段处理中的应用
投稿时间:2006-10-25  修订日期:2006-10-25  点此下载全文
引用本文:李文宝,韩旭,$2,沈少波.托换技术在地勘坑道沉降区段处理中的应用[J].钻探工程,2006,33(12):50-51.
. Application of Underpinning for Dealing with Sunk Area in Exploring Tunnel[J]. Drilling Engineering, 2006,33(12):50-51.
摘要点击次数: 906
全文下载次数: 838
李文宝  韩旭  $2  沈少波
[1]武警黄金第二总队,河北廊坊065000 [2]武警黄金第五支队,陕西西安710054
中文摘要:在地勘坑道施工中,由于岩层松散破碎,加上断层和裂隙发育,渗、漏水严重,已经支护好的坑道出现沉降,坍塌物将木支架压弯压折。补支护后,该区域由于地压过大又出现了沉降。存处理过程中应用托换技术进行了尝试,顺利解决了这一问题。介绍了伸缩式组合钢支架的设计制作以及处理过程。
中文关键词:托换技术 坑道 支护 沉降
 
Application of Underpinning for Dealing with Sunk Area in Exploring Tunnel
LI Wen-bao  HAN Xu  LIMing  SHEN Shao-bo
Abstract:In exploring tunnel, because of loose and broken of the stratum, in addition to fault and crack developing, seepage and leakage are serious, landslide occurs in supported tunnel, and wood support was curved and broken by falling pressure. After supplementary support, sinking emerged in the area. We tried to use underpinning, and the problem got solved successfully. Design and manufacturing of expanding combined steel support and the replacing procedure are introduced.
keywords:underpinning  tunnel  support  sink
查看全文  查看/发表评论  下载PDF阅读器