岩土钻掘工程项目施工推行“5S”管理设想
投稿时间:2006-07-06  修订日期:2006-07-06  点此下载全文
引用本文:周作明.岩土钻掘工程项目施工推行“5S”管理设想[J].钻探工程,2006,33(12):52-57.
. Plan of Practicing "5S" Management in Rock and Soil Drilling Engineering Project[J]. Drilling Engineering, 2006,33(12):52-57.
摘要点击次数: 1015
全文下载次数: 842
周作明
天津华北地质勘查局,天津300181
中文摘要:根据在工业企业推广“5S”管理的实践,提出了岩土钻掘项目施工推行“5S”管理的设想。介绍了“5S”管理的概念,分析了岩土钻掘项目施工推行“5S”管理的策略要点。
中文关键词:岩土钻掘工程 施工项目管理 5S
 
Plan of Practicing "5S" Management in Rock and Soil Drilling Engineering Project
ZHOU Zuo-ming
Abstract:"5S" management is proposed for rock and soil drilling engineering project according to the same management in industrial enterprises.The idea of "5S" management is introduced,and the main tactics of practicing "5S" management are analyzed.
keywords:rock and soil drilling engineering  construction project management  5S