采用钻孔注水试验确定里耶防洪堤地基渗透系数 |
投稿时间:2006-02-06 修订日期:2006-02-06 点此下载全文 |
引用本文:雷金山,杨秀竹,罗小勇.采用钻孔注水试验确定里耶防洪堤地基渗透系数[J].钻探工程,2006,33(7):30-31.LEI Jin-shan,YANG Xiu-zhu,LUO Xiao-yong. Application of Water Injection on Testing Permeability Coefficient of Foundation for Liye Embankment[J]. Drilling Engineering, 2006,33(7):30-31. |
摘要点击次数: 908 |
全文下载次数: 370 |
|
|
中文摘要:为了进一步确定里耶古镇防洪堤砂卵石地基的渗透特性,采用原位钻孔注水试验的方法对5个断面共15个孔段进行了测定。试验结果表明,该防洪堤地基的渗透系数普遍较大,同一断面不同位置渗透系数存在一定差异,其中:1+070断面前坡马道渗透系数是后坡马道的4倍;2+470断面前坡马道的渗透系数是轴线处的10倍。 |
中文关键词:里耶防洪堤 砂卵石地基 渗透系数 钻孔 注水试验 |
|
Application of Water Injection on Testing Permeability Coefficient of Foundation for Liye Embankment |
|
|
Abstract:In order to confirm the boulder foundation permeability of Liye embankment, the spot boring water injection was adopted to test permeability coefficient from fifteen hole segments in five sections. The test results show that the permeability coefficients of embankment foundation are generally big, and different in each spot on the same section. The permeability coefficient of front slope path of 1+070 section is four times that of back slope path, and the coefficient of front slope path of 1+470 section is ten times that on the axle. |
keywords:Liye embankment boulder foundation permeability coefficient bore water injection test |