兰渝铁路深孔钻探沉渣处理 |
投稿时间:2009-07-06 修订日期:2009-11-16 点此下载全文 |
引用本文:冯海明,李均宏.兰渝铁路深孔钻探沉渣处理[J].钻探工程,2009,36(12):23-25.FENG Hai-ming,LI Jun-hong. Sediment Treatment for Deep Hole Drilling in Lanzhou-Chongqing Railway[J]. Drilling Engineering, 2009,36(12):23-25. |
摘要点击次数: 1088 |
全文下载次数: 954 |
|
|
中文摘要:孔内沉渣厚时会造成下钻不到底或埋钻事故,严重影响钻探的正常进行。介绍了兰渝铁路工程地质勘察孔深850 m的西秦岭3号孔沉渣处理过程,总结出一些在破碎地层沉渣事故处理的经验和措施,为类似事故提供借鉴。 |
中文关键词:兰渝铁路 工程地质勘察 深孔钻探 沉渣处理 绳索取心钻进 |
|
Sediment Treatment for Deep Hole Drilling in Lanzhou-Chongqing Railway |
|
|
Abstract:Thick in-hole sediment affects drilling operation with drilling tool not going down to the hole bottom or drill bury. The paper introduced sediment treatment in the 3# hole of west Qingling with depth of 850m in engineering geological exploration of Lanzhou-Chongqing railway, and summed up some treatment experience and measures in treatment of sediment in broken formation for the similar drilling failure. |
keywords:Lanzhou-Chongqing railway engineering geological exploration deep hole drilling sediment treatment wire-line coring drilling |
查看全文 查看/发表评论 下载PDF阅读器 |