北京地铁十号线熊猫环岛车站降水工程技术 |
投稿时间:2009-11-23 修订日期:2009-11-23 点此下载全文 |
引用本文:王维献.北京地铁十号线熊猫环岛车站降水工程技术[J].钻探工程,2010,37(3):42-45,48.WANG Wei-xian. Dewatering Technology of Subway Station Construction in Xiongmaohuandao Station of Beijing Subway Line10[J]. Drilling Engineering, 2010,37(3):42-45,48. |
摘要点击次数: 1000 |
全文下载次数: 932 |
|
|
中文摘要:结合北京地铁十号线熊猫环岛车站降水工程实践,介绍了利用反循环钻机施工管井工艺、抽渗结合法进行基坑降水的方法;并对其地下水监测及沉降监测等施工技术、降水对周围环境的影响及防治措施,以及施工中出现的问题和处理经验进行总结。 |
中文关键词:地铁车站 管井降水 泵吸反循环 抽渗结合 |
|
Dewatering Technology of Subway Station Construction in Xiongmaohuandao Station of Beijing Subway Line10 |
|
|
Abstract:Based on the practice of precipitation project in Xiongmaohuandao station of Beijing subway Line10#, tubular well construction technology with reverse circulation drill and foundation pit dewatering by the combination of suction and seepage were introduced; construction technology of groundwater monitoring and settlement monitoring, environmental impact of dewatering and the countermeasures, problems in construction and the treatment experience were together summed up. |
keywords:subway station tubular well subway dewatering pump suction reverse circulation combination of suction and seepage |