锦屏一级水电站坝基无盖重固结灌浆施工工艺探讨 |
投稿时间:2010-12-15 修订日期:2010-12-15 点此下载全文 |
引用本文:杨世伟,李德勇.锦屏一级水电站坝基无盖重固结灌浆施工工艺探讨[J].钻探工程,2011,38(8):56-58,63.YANG Shi-wei,LI De-yong. Discussion on Construction Technology of Consolidation Grouting without Concrete Covering for Dam Foundation in Jinping 1 Hydropower Station[J]. Drilling Engineering, 2011,38(8):56-58,63. |
摘要点击次数: 1106 |
全文下载次数: 840 |
|
|
中文摘要:锦屏一级水电站大坝由于基础层混凝土仓面面积大,温控要求严格、间歇期短,固结灌浆施工与坝体混凝土温控存在较大矛盾,主要采取无盖重固结灌浆加有盖重补强固结灌浆及引管的方式进行。主要就无盖重固结灌浆主要存在问题进行了分析和探讨。 |
中文关键词:水电站坝基 无盖重固结灌浆 锦屏一级水电站 |
|
Discussion on Construction Technology of Consolidation Grouting without Concrete Covering for Dam Foundation in Jinping 1 Hydropower Station |
|
|
Abstract:In Jinping 1 hydropower station, because of large concrete surface of dam foundation, strict temperature control, short construction interval and the contradiction between consolidation grouting and concrete temperature control, both consolidation grouting without concrete covering and reinforced consolidation grouting with concrete covering were adopted. The paper analyzed and discussed the main problems of consolidation grouting without concrete covering. |
keywords:dam foundation consolidation grouting without concrete covering Jinping 1 hydropower station |