汶川地震断裂带科学钻探项目钻探施工进展综述 |
投稿时间:2012-08-08 修订日期:2012-08-08 点此下载全文 |
引用本文:张伟,贾军,胡时友,等.汶川地震断裂带科学钻探项目钻探施工进展综述[J].钻探工程,2012,39(9):1-5.ZHANG Wei,JIA Jun,HU Shi-you,et al. Overview on Drilling Construction Progress in Wenchuan Earthquake Fault Scientific Drilling Project[J]. Drilling Engineering, 2012,39(9):1-5. |
摘要点击次数: 1080 |
全文下载次数: 847 |
|
基金项目:科技部科技支撑计划专项“汶川地震断裂带科学钻探(WFSD)”项目之“科学钻探与科学测井”课题 |
|
中文摘要:介绍了汶川地震断裂带科学钻探项目的钻探施工情况,包括钻探施工进展、施工中遇到的技术难题以及为解决这些技术问题采取的技术措施和取得的成果。 |
中文关键词:汶川地震 地震断裂带 科学钻探 进展 |
|
Overview on Drilling Construction Progress in Wenchuan Earthquake Fault Scientific Drilling Project |
|
|
Abstract:The paper introduces the drilling operation of Wenchuan earthquake fault scientific drilling project, including drilling progress, technical problems encountered while drilling with the corresponding measures and the achievements obtained during drilling operation. |
keywords:Wenchuan earthquake earthquake fault scientific drilling progress |