大直径嵌岩斜桩冲击成孔速度的影响因素分析
投稿时间:2020-10-21  修订日期:2020-12-29  点此下载全文
引用本文:胡培强,王志明,周伏萍,等.大直径嵌岩斜桩冲击成孔速度的影响因素分析[J].钻探工程,2021,48(2):104-109.
HU Peiqiang,WANG Zhiming,ZHOU Fuping,et al. Influencing factors analysis of the rate of penetration during the percussion drilling of large diameter rock-socketed inclined pile[J]. Drilling Engineering, 2021,48(2):104-109.
摘要点击次数: 748
全文下载次数: 462
作者单位E-mail
胡培强* 江西省地质工程(集团)公司江西 南昌 330029 2247281825@qq.com 
王志明 中国地质大学(武汉)工程学院湖北 武汉 430074  
周伏萍 江西省地质工程(集团)公司江西 南昌 330029  
谭松成* 中国地质大学(武汉)工程学院湖北 武汉 430074 wstansongcheng@cug.edu.cn 
尧在雨 江西省地质工程(集团)公司江西 南昌 330029  
段隆臣 中国地质大学(武汉)工程学院湖北 武汉 430074  
基金项目:国家自然科学基金项目“液动冲击回转作用下热压WC-Cu基孕镶金刚石钻头的磨损行为研究”(编号:41972327);江西省地质工程(集团)公司地基与基础新技术集成研究项目“嵌岩斜桩冲击钻进成孔关键技术研究”(编号:2020056101)
中文摘要:随着工程建设向外海、深水区域不断发展,大直径嵌岩灌注斜桩因具有更好的承受水平载荷能力,在港口、码头等构筑物基础施工中得到了广泛的应用。受工程场地和桩孔设计参数等的影响,该类嵌岩桩多采用冲击成孔的施工方式,且其持力层的成孔速度相对其他灌注桩施工方法仍然非常低(0.1~0.3 m/h)。基于此,本文建立了大直径嵌岩斜桩冲击成孔过程中的冲锤下落受力模型,并通过单因素分析和双因素耦合分析的方式研究了冲锤质量、冲击行程、桩孔斜度,以及冲锤与钢护筒之间的摩擦系数等因素对冲击成孔速度的影响规律。分析认为,在桩孔斜度确定的情况下,冲锤质量和冲击行程是影响冲击成孔效率的主要因素,而摩擦系数的影响可以不作具体要求。
中文关键词:嵌岩桩  斜桩  冲击成孔  成孔速度
 
Influencing factors analysis of the rate of penetration during the percussion drilling of large diameter rock-socketed inclined pile
Abstract:Nowadays, engineering construction tends to offshore and deep-water areas. As a result, large diameter rock-socketed inclined (RSI) pile has been widely applied in structures foundation in port and dock areas due to its better ability to withstand horizontal loads. However, because of limited construction sites and designed piles parameters etc., the RSI piles construction is usually carried out by percussion drilling, with its rate of penetration (ROP,0.1~0.3m/h) much lower than that of cast-in-place piles by other construction methods. Based on this, a force model of punch hammer was established in this paper, to study its forced state of dropping process when it is applied to drill a large diameter RSI pile. The influence laws of hammer weight, stroke, pile inclination, and friction coefficient between the punch and steel guard were studied by single-factor and two-factor analyses respectively. According to the analyses, it is found that the hammer weight and stroke are the key factors affecting the ROP of RSI piles when the pile inclination is constant, and the influence of friction coefficient can be ignored to a certain degree.
keywords:rock-socketed pile  inclined pile  percussion drilling  speed of piles completion