引用本文:曾鹏九.拦河坝砼防渗墙的施工技术[J].钻探工程,1996,(5):46-48.
. Concrete Seepage Cut-off Wall Construction for a River-crossing Dam[J]. Drilling Engineering, 1996,(5):46-48.
摘要点击次数: 1165
全文下载次数: 315
曾鹏九
黄河水利委员会勘测规划设计院地质勘探总队
中文摘要:拦河坝砼防渗墙多在砂层与砂卵石层上施工。地基处理根据地质条件选择,施工方法有无导孔挖槽、导孔挖槽、冲击成槽、回转钻成槽、锯槽机成槽。锯槽机为新型防渗成墙材料提供了新的施工手段,但有局限性。
中文关键词:防渗墙,挖槽方法,挖槽施工,锯槽机,清底,浇灌
 
Concrete Seepage Cut-off Wall Construction for a River-crossing Dam
Zeng Pengjiu
Abstract:The seepage cut -off wall for the river-crossing dam is usually installed in the sand and the sandy gravel. The dam site treatment depends on the geological conditions and the construction methods include trench-cutting without pilot hole, trench-cutting with pilot hole, percussive trenching, rotsry trenching and trenching by trench saw. The trench saw provides a new construction method for the new seepage cut-off walling material, but has its limitation.
keywords:seepage cut-off wall trench-cutting method trench saw bottom cleaning concreting