非开挖施工建模的现状和前景 |
投稿时间:2004-01-18 修订日期:2004-01-18 点此下载全文 |
引用本文:王兰锟.非开挖施工建模的现状和前景[J].钻探工程,2004,31(6):35-37.WANG Lan-kun. The Status Quo and Prospect of No-dig Construction Modeling in China[J]. Drilling Engineering, 2004,31(6):35-37. |
摘要点击次数: 963 |
全文下载次数: 265 |
|
|
中文摘要:讨论了非开挖施工主要级别的建模:微隧顶管、HDD和夯管锤,并通过微隧顶管建模的过程说明定位于稳定性与鲁棒性理论、多体动力学理论的必然趋向,以及建模工作将会成为非开挖产业文化的一部分,将推动非开挖产业的发展,并由高端基础研发达到市场份额占有的目的。 |
中文关键词:同胚 拓扑不变量 高次奇点 稳定极限环 混合积 Cobb-Douglas生产函数 |
|
The Status Quo and Prospect of No-dig Construction Modeling in China |
|
|
Abstract:This paper discussed modeling about microtunneling pipejacking, HDD and ram construction in China, especially as the microtunneling X-Y system in laser target and how it developed to the singular point and limit cycles for a dynamic system, and then location by the frame which stability/robust stability theory and flexible multibody theory. |
keywords:homeomorphism topological invariant singular point with high order stable limit cycle mixed product Cobb-Douglas produce function |
查看全文 查看/发表评论 下载PDF阅读器 |