沉管灌注桩大面积断桩原因分析
投稿时间:2005-06-01  修订日期:2005-06-01  点此下载全文
引用本文:莫继军.沉管灌注桩大面积断桩原因分析[J].钻探工程,2005,32(10):14-16.
MO Ji-jun. Analyses on Causes of A Large Number of Piles Broken in Driven Cast-in-place Pile[J]. Drilling Engineering, 2005,32(10):14-16.
摘要点击次数: 990
全文下载次数: 463
作者单位E-mail
莫继军 广西梧州市建筑设计院 wzmojijun@163.com 
中文摘要:通过2个工程实例分析了沉管灌注桩出现大面积断桩的原因是由于后期基坑开挖不当造成的,并提出了预防断桩出现的一些措施以及对断桩的处理补救措施。
中文关键词:沉管灌注桩  断桩  处理补救措施  预防措施
 
Analyses on Causes of A Large Number of Piles Broken in Driven Cast-in-place Pile
Abstract:Base on two concrete engineering examples, the author came to the conclusion that a large number of piles broken in driven cast-in-place pile are due to the incorrect digging of foundation pit late. Besides, some methods to prevent the piles broken and to deal with them are discussed.
keywords:driven cast-in-place pile  pile broken  the method to deal with the pile broken  the method to prevent the pile broken