西藏直孔水电站大坝混凝土防渗墙超前支护成槽试验研究及施工
投稿时间:2005-06-08  修订日期:2005-06-08  点此下载全文
引用本文:马邦凯,牟兴华,蔡海燕.西藏直孔水电站大坝混凝土防渗墙超前支护成槽试验研究及施工[J].钻探工程,2005,32(12):3-5.
MA Bang-kai,MU Xing-hua,CAI Hai-yan. Test Research and Construction of Concrete Leakage Prevention Wall with Advanced Support[J]. Drilling Engineering, 2005,32(12):3-5.
摘要点击次数: 944
全文下载次数: 339
作者单位E-mail
马邦凯 中国水电七局  
牟兴华 中国水电七局 muxinghua6862@vip.sina.com 
蔡海燕 中国水电七局  
中文摘要:在西藏直孔水电站松散砂卵石地层混凝土防渗墙成槽施工中,结合坝基水文地质及工程地质特点,创造性地提出了超前支护成槽方案,通过三维应力模拟和渗透试验,结合现场生产试验,对原方案更进一步完善,在施工中加以应用获得了成功。
中文关键词:直孔水电站  超前支护成槽  三维应力模拟  松散砂卵石地层  混凝土防渗墙
 
Test Research and Construction of Concrete Leakage Prevention Wall with Advanced Support
Abstract:Slot completion with advanced support was creatively bought forward during concrete leakage prevention wall making in loose sand and pebble formation for hydropower, considering hydrogeological and geotechnical characteristics of Dam Foundation. The plan was improved after three dimension stress simulation and permeation test, and during actual construction trials. The application results were excellent.
keywords:Zhikong Hydropower  slot completion with advanced support  three dimension simulation  loose sand and pebble formation  concrete leakage prevention wall
查看全文  查看/发表评论  下载PDF阅读器