廊坊市吉祥小区CFG桩施工技术
投稿时间:2005-04-11  修订日期:2005-04-11  点此下载全文
引用本文:陈磊.廊坊市吉祥小区CFG桩施工技术[J].钻探工程,2005,32(5):19-21.
. The Construction Tech. of the CFG Piles Used in Langfang Jixiang House Estate[J]. Drilling Engineering, 2005,32(5):19-21.
摘要点击次数: 1033
全文下载次数: 265
作者单位
陈磊 河北廊坊中房房地产股份有限公司 
中文摘要:介绍了河北省廊坊市吉祥小区CFG桩的施工工艺、冬季施工所采取的技术措施、单桩复合地基静载荷试验及桩基完整性检测情况。
中文关键词:CFG桩  长螺旋钻  地基处理  冬季施工
 
The Construction Tech. of the CFG Piles Used in Langfang Jixiang House Estate
Abstract:This article introduced the construction technology, the technical measures used in cold weather construction, static load test of the single pile composite foundation, check and measure of the pile integrity of the CFG piles in Langfang Jixiang House Estate.
keywords:CFG pile,long auger drill,foundation treatment,cold weather construction
查看全文  查看/发表评论  下载PDF阅读器