圆梁山隧道施工期间增加辅助坑道的设计与施工
投稿时间:2004-11-27  修订日期:2004-11-27  点此下载全文
引用本文:曾蔚,张民庆.圆梁山隧道施工期间增加辅助坑道的设计与施工[J].钻探工程,2005,32(5):56-59.
ZENG Wei,ZHANG Min-qing. The Design and Engineering for Additional Accessorial Tunnels While the Main Tunnel Is under Construction in Yuanliangshan Tunnel[J]. Drilling Engineering, 2005,32(5):56-59.
摘要点击次数: 910
全文下载次数: 361
作者单位
曾蔚 长安大学 
张民庆 铁道部工管中心宜万总指挥部 
中文摘要:在圆梁山隧道修建期间,为解决进口车站大跨段的快速施工以及施工中所遇到的2、3、4和5号溶洞的涌水涌砂难题,创造性地新增设了3条横通道、1条地质探洞、2条迂回导坑和4条泄水洞共10条辅助坑道。主要介绍了施工期间增设的10条辅助坑道的设计与施工。
中文关键词:圆梁山隧道  辅助坑道  设计与施工
 
The Design and Engineering for Additional Accessorial Tunnels While the Main Tunnel Is under Construction in Yuanliangshan Tunnel
Abstract:In order to solve the water and sand inflows during the construction of Yuanliangshan Tunnel, as well as to speed up the construction of big stride of inlet station, 10 accessorial tunnels were creatively built. They are transverse, geological explore, roundabout and draining tunnels. The paper mainly introduces the design and construction of these accessorial ones.
keywords:Yuanliangshan tunnel  accessorial tunnels  design and construction