引用本文:黄栋良,罗伟奇,刘文剑,等.雪峰山隧道局部涌水模型探讨[J].钻探工程,2006,33(7):62-63.HUANG Dong-liang,LUO Wei-qi,LIU Wen-jian,et al. Discussion on the Part Inflowing Model of Xuefeng Mountain Tunnel[J]. Drilling Engineering, 2006,33(7):62-63.
Discussion on the Part Inflowing Model of Xuefeng Mountain Tunnel
Abstract:Real-time monitor is made to the groundwater with the completion of Xuefeng Mountain Tunnel. Inflowing model of triangular prism is reducted and tested to show its practice value.