中文摘要:大连中远30万t浮船坞工程是目前国内最大的浮船坞工程,共设计海上基桩30根,桩径800mm,嵌入中风化岩石4~5m,最深达8m。利用驳船进行海上基桩施工,采用FGC-15D型大直径湿式反循环潜孔锤钻进成孔,满足施工工艺和工期要求。
中文关键词:浮船坞工程 海上基桩 驳船 大直径潜孔锤
 
Construction Technology for Sea Pile in Floating Dock of Dalian COSCO
LI Hu  LU Fei  ZHAO Zhen-feng  LI Gui- hua
Abstract:Dalian COSCO 300000 DWT floating dock is the largest floating dock engineering in China at present,with 30 sea piles of 800 mm in diameter,embedded 4~5 m(the deepest is up to 8 m) in intermediary weathering rock.Barge was used in sea pile construction,and FGC-15D large diameterwet reverse circulation DTH was adopted for hole completion.