西华山钨矿区复杂地层钻进的综合治理措施
投稿时间:2009-03-06  修订日期:2009-06-30  点此下载全文
引用本文:廖远苏.西华山钨矿区复杂地层钻进的综合治理措施[J].钻探工程,2009,36(9):17-20.
LIAO Yuan-su. Comprehensive Control Measures for Complex Formation in Xihuashan Granite Mine[J]. Drilling Engineering, 2009,36(9):17-20.
摘要点击次数: 1238
全文下载次数: 932
作者单位E-mail
廖远苏* 江西有色地质勘查二队 lys8224807@126.com 
中文摘要:总结了西华山钨矿区综合治理复杂地层的经验;着重介绍了PAA聚合物在断层破碎带、易水化碎裂岩体中的使用方法和护壁堵漏效果;提出了治理复杂地层应采取“‘辨证论治’、灵活运用”的思路方法,最大限度地降低施工成本,提高钻进效率。
中文关键词:复杂地层  PAA聚合物  磨砂法  护壁  堵漏
 
Comprehensive Control Measures for Complex Formation in Xihuashan Granite Mine
Abstract:Experience was summed up about comprehensive control on complex formation in Xihuashan granite mine; the paper emphatically introduced the application method and the effects of wall protection and leaking stoppage with PAA polymer in fault fracture zone and hydration cataclastic rock. “Differentiation treatment” and “flexible application” were put forward to the control on complex formation for maximum low cost and high drilling efficiency.
keywords:complex formation  PAA polymer  edge outcroping by abrasion  wall protection  leaking stoppage
查看全文  查看/发表评论  下载PDF阅读器