昆明新南亚风情园静压桩浮桩原因及复压法处理技术
投稿时间:2008-07-16    点此下载全文
引用本文:李志江.昆明新南亚风情园静压桩浮桩原因及复压法处理技术[J].钻探工程,2009,36(4):55-58.
LI Zhi-jiang. Cause of Static Pressure Pile Floating and Repressing Treatment[J]. Drilling Engineering, 2009,36(4):55-58.
摘要点击次数: 1051
全文下载次数: 1244
作者单位E-mail
李志江 云南国土建设工程总公司昆明分公司 jzhyx123@163.com 
中文摘要:昆明新南亚风情园基础设计为静压预制管桩,试桩承载力等参数满足设计要求,但工程桩施工完毕,进行检测时发现浮桩。通过分析浮桩的原因,采取复压处理方案,各项参数符合设计要求。总结了静压桩施工和浮桩处理的经验和体会。
中文关键词:静压预制管桩  浮桩  挤土效应(应力)  超孔隙水压力  承载力  复压
 
Cause of Static Pressure Pile Floating and Repressing Treatment
Abstract:The foundation of Nanyafengqing Garden was designed of static pressure pre-cast tube pipe; pile floating was detected after construction. Through the cause analysis, repressing treatment scheme was applied with parameters satisfying the design requirement.
keywords:static pressure pre-cast tube pipe  pipe floating  compaction effect  excess pore water pressure  bearing capacity  repressing