大口径煤矿应用井施工技术难点及应对措施 |
投稿时间:2010-05-13 修订日期:2010-05-13 点此下载全文 |
引用本文:王英,刘炳志,杜庆军.大口径煤矿应用井施工技术难点及应对措施[J].钻探工程,2010,37(12):51-53.WANG Ying,LIU Bing-zhi,DU Qing-jun. Technical Difficulties in Large Diameter Well Drilling in Coal Mine Construction and the Countermeasures[J]. Drilling Engineering, 2010,37(12):51-53. |
摘要点击次数: 959 |
全文下载次数: 983 |
|
|
中文摘要:结合山东省龙固矿井煤矿应用井施工工程实际,阐述了在巨厚表土层中,无表层套管施工的优点及施工难度,并提出了应对措施:通过塔式钻具防斜、陀螺仪测斜、螺杆钻纠斜、优质泥浆护壁、浮力器平衡套管重力、气动扳手减轻工人劳动强度等措施,提前完成了2口井的施工。同时,由于无表层套管,大大降低了施工成本,节约了施工时间。 |
中文关键词:大口径井 无表层套管 施工难点 应对措施 |
|
Technical Difficulties in Large Diameter Well Drilling in Coal Mine Construction and the Countermeasures |
|
|
Abstract:Based on a well drilling engineering of a mine in Shandong, the paper introduced the advantages and difficulties of construction without surface casing drilling with the countermeasures. The construction of 2 wells were fulfilled ahead of time through deviation control by tower drilling tools, inclination survey by gyro inclinometer, wall protection by high-quality mud and working intensity reducing by buoyancy device and impact wrench. Drilling without surface casing greatly saved the construction cost. |
keywords:large diameter well no surface case construction difficulty countermeasure |