苏通大桥超长桩桩底后压浆试验及效果
投稿时间:2011-07-29  修订日期:2011-11-06  点此下载全文
引用本文:彭仕奇.苏通大桥超长桩桩底后压浆试验及效果[J].钻探工程,2011,38(11):54-58.
PENG Shi-qi. Test of Pile Bottom Post Grouting for Super Long Pile in Sutong Bridge and the Effect[J]. Drilling Engineering, 2011,38(11):54-58.
摘要点击次数: 1088
全文下载次数: 939
作者单位E-mail
彭仕奇* 江苏经贸职业技术学院 sqczpb@163.com 
中文摘要:在苏通大桥松散软弱的地层条件,实施超长(>100 m)、超大(φ2.5 m)摩擦桩桩底后压浆工程,在我国是首次运用。结合工程实践,就压浆工程的设计、施工的技术要点进行全面介绍。通过对钻孔取样分析,指出浆液初凝时间地表实验与地下实际存在较大差异;通过施工体验,结合取样显示的浆液扩散渗透状况,提出可渗透地层以注浆量为控制参数,压力不列为控制参数的思路。
中文关键词:钻孔灌注桩  桩底后压浆  注浆量  超长桩  苏通大桥
 
Test of Pile Bottom Post Grouting for Super Long Pile in Sutong Bridge and the Effect
Abstract:Pile bottom post grouting for friction pile with super long (>100m) and super large(φ2.5m)was first applied in loose and soft formation in Sutong Bridge construction in China. Based on the engineering practice, the design and key technical points were introduced. By the analysis on the samples, the obvious difference of slurry initial setting time between ground experiment and underground situation was found. According to the slurry diffusion and permeation conditions by sampling, the grouting amount, not the pressure, is taken as control parameter in permeable formation.
keywords:bored grouting pile  pile bottom post grouting  grouting amount  super long pile  Sutong brigde