马坑外围矿区ZK7924孔施工难点及对策
投稿时间:2011-09-02  修订日期:2011-09-02  点此下载全文
引用本文:彭金灶.马坑外围矿区ZK7924孔施工难点及对策[J].钻探工程,2011,38(9):10-12,15.
PENG Jin-zao. Construction Difficulties in ZK7924 Hole of Surrounding Mining Area of Makeng[J]. Drilling Engineering, 2011,38(9):10-12,15.
摘要点击次数: 906
全文下载次数: 322
作者单位
彭金灶* 福建省地勘局地质八队 
中文摘要:重点介绍马坑外围矿区ZK7924钻探技术难点,阐述了冲洗液、护壁堵漏、相关技术参数及水泥浆替水量的计算方法,顺利完成了该钻孔的施工。
中文关键词:钻探  取心方法  护壁堵漏  水泥浆  替水量
 
Construction Difficulties in ZK7924 Hole of Surrounding Mining Area of Makeng
Abstract:The paper mainly introduced the drilling technical difficulties in ZK7924 hole of surrounding mining area of Makeng and the successful construction; described the flushing fluid, wall protection and leakage control, the correlating technical parameters and the calculation methods of water exchange amount of cement slurry.
keywords:drilling  coring method  wall protection and leakage control  cement slurry  water exchange amount
查看全文  查看/发表评论  下载PDF阅读器