某深基坑支护设计方案实施过程中的优化
投稿时间:2012-02-16  修订日期:2012-05-27  点此下载全文
引用本文:杜文宇,郭行.某深基坑支护设计方案实施过程中的优化[J].钻探工程,2012,39(7):67-70.
DU Weng-yu,GUO Hang. Optimization in Design Scheme Implementation Process of a Deep Foundation Pit Supporting[J]. Drilling Engineering, 2012,39(7):67-70.
摘要点击次数: 1073
全文下载次数: 837
作者单位E-mail
杜文宇* 江苏省地质矿产勘查局第五地质大队 549429426@qq.com 
郭行 江苏省地质矿产勘查局第五地质大队 549429426@qq.com 
中文摘要:通过徐州锦绣大厦深基坑开挖过程中的变形情况,分析该工程基坑变形的根本原因,及时对设计方案进行了合理的优化,有效地限制了基坑的变形,不仅保证了基坑周边建筑物的安全,还节约了造价、方便了施工、缩短了工期。
中文关键词:深基坑  支护设计  基坑变形  方案优化
 
Optimization in Design Scheme Implementation Process of a Deep Foundation Pit Supporting
Abstract:According to the deformation in a deep foundation pit excavation process, analysis was made on the basic cause of engineering foundation pit deformation; the reasonable optimizations were timely implemented on the original design scheme with effective limits to the deformation of foundation pit with the safety ensuring on surrounding buildings of the foundation pit, cost saving, convenient construction and short construction period.
keywords:deep foundation pit  supporting design  foundation pit deformation  scheme optimization