某电站左岸溢洪道单孔灌浆效果分析
投稿时间:2012-02-22  修订日期:2012-03-04  点此下载全文
引用本文:许启云.某电站左岸溢洪道单孔灌浆效果分析[J].钻探工程,2012,39(7):63-66.
XU Qi-yun. Analysis on Grouting Effect of Single Borehole for the Left Spillway of a Power Station[J]. Drilling Engineering, 2012,39(7):63-66.
摘要点击次数: 1221
全文下载次数: 791
作者单位E-mail
许启云* 浙江华东建设工程有限公司 xu_qiyun@126.com 
中文摘要:某电站左岸溢洪道为优化灌浆设计方案,需要对左岸溢洪道布置钻孔进行综合勘察,并在此基础上按照灌浆设计要求进行单孔灌浆试验。为确保施工质量,事先对工艺流程进行优化,同时精选了设备和人员,并严格按照灌浆规范以及符合设计要求的情况下,通过在溢洪道启闭机闸墩、溢洪道二侧、溢流堰等具有代表性的部位进行单孔灌浆试验,取得了良好的灌浆效果,为完善灌浆设计方案提供了依据。
中文关键词:单孔灌浆  效果分析  优化设计
 
Analysis on Grouting Effect of Single Borehole for the Left Spillway of a Power Station
Abstract:To optimize grouting design scheme of the left spillway for a power station, comprehensive survey was made for borehole arrangement and single borehole grouting tests were demanded. In order to ensure construction quality, the process flow was optimized, the equipment and personnel were strictly selected and single borehole grouting tests were made at representative regions according to the grouting specifications and design requirements, such as gate hoist, 2 sides of spillway and overflow weir with good grouting effects, which could be the basis for sound grouting design scheme.
keywords:single borehole grouting  effect analysis  optimization design