某电厂水库岸边取水工程施工实践 |
投稿时间:2013-10-17 修订日期:2013-10-17 点此下载全文 |
引用本文:李建斌,刘国谋,赵存宝,等.某电厂水库岸边取水工程施工实践[J].钻探工程,2014,41(2):74-77,81.LI Jian-bin,LIU Guo-mou,ZHAO Cun-bao,et al. Construction Practice of Water Intake Engineering near the Reservoir[J]. Drilling Engineering, 2014,41(2):74-77,81. |
摘要点击次数: 1116 |
全文下载次数: 739 |
|
|
中文摘要:为满足某电厂供水需求,需在某水库进行岸边取水工程(含取水竖井、引水隧道、引水明渠3部分)施工。通过短段掘砌逆作工艺,井筒壁溶洞导水并将导出的水作为水源的一部分,实现了井筒干封底,顺利完成井筒施工;采用顶管技术+管顶注浆技术在破碎岩体、涌水量较大地层成功完成引水隧道施工;通过岩塞爆破成功实现引水隧道和水库的连接;通过船载冲击成槽技术,实现了引水明渠的施工。 |
中文关键词:取水工程 短段掘砌 逆作法 导水 干法封底 隧道顶管 冲击成槽 |
|
Construction Practice of Water Intake Engineering near the Reservoir |
|
|
Abstract:To meet the water supply demand of a power plant, the water intake engineering construction (containing water intake shaft, draw water tunnel and open diversion channel) at a reservoir was needed. By means of the top-down method of excavation with lining alternated in short segments, guiding cavern water from shaft wall was derived as a part of the water source, and the shaft construction was completed with dry bottom-sealing. By pipe jacking and pipe top grouting technologies, draw water tunnel was accomplished in the strata with broken rocks and abundant water inflow; by the rock plug blasting, the connection of the tunnel and the reservoir was successfully realized; and by percussive trenching technology, open diversion channel was constructed. |
keywords:water intake engineering excavation with lining alternated in short segments top-down method guiding water dry bottom-sealing pipe jacking in tunnel percussive trenching |