提高印尼AWAR-AWAR燃煤电站桩基承载力的技术措施
投稿时间:2009-07-16  修订日期:2009-07-16  点此下载全文
引用本文:王德武,张兆金.提高印尼AWAR-AWAR燃煤电站桩基承载力的技术措施[J].钻探工程,2009,36(8):69-72.
WANG De-wu,ZHANG Zhao-jin. Technical Measures for Improving Bearing Capacity of Pile Foundation of AWAR-AWAR Pulverized Power Plant in Indonesia[J]. Drilling Engineering, 2009,36(8):69-72.
摘要点击次数: 1110
全文下载次数: 970
作者单位E-mail
王德武* 浙江省岩土基础公司 ding0810@163.com 
张兆金 浙江省岩土基础公司  
中文摘要:通过印尼AWAR-AWAR 2×350MW燃煤电站桩基2次试桩,改进施工工艺,提高了软质、松散、裂隙、孔洞和蜂窝结构发育、严重漏水强风化石灰岩地层的桩基承载力,具有很好的经济和社会效益。
中文关键词:桩基  石灰岩  旋挖钻进  承载力
 
Technical Measures for Improving Bearing Capacity of Pile Foundation of AWAR-AWAR Pulverized Power Plant in Indonesia
Abstract:By the secondary pile testing in AWAR-AWAR 2×350MW pulverized power plant in Indonesia, the construction technology was modified with the improvement on bearing capacity of pile foundation in soft, loose, fractured, cavity and honeycomb structure developing and weathering limestone formation.
keywords:pile foundation  limestone  rotary drilling  bearing capacity