冻结井筒冻结孔涌水机理及逆流引流注浆封堵技术 |
投稿时间:2012-03-12 修订日期:2012-03-12 点此下载全文 |
引用本文:曹祖宝,邵红旗,朱明诚.冻结井筒冻结孔涌水机理及逆流引流注浆封堵技术[J].钻探工程,2012,39(8):46-49.CAO Zu-bao,SHAO Hong-qi,ZHU Ming-cheng. In-rushing Water Mechanism of Freezing Hole of Frozen Shaft and Counter-flow Water Diversion Grouting Sealing Technology[J]. Drilling Engineering, 2012,39(8):46-49. |
摘要点击次数: 1014 |
全文下载次数: 791 |
|
基金项目:中煤科工集团西安研究院青年创新基金项目(2011XAYQN013) |
|
中文摘要:针对我国西部地区深基岩冻结井筒冻结孔涌水水害技术难题,以胡家河矿主立井井筒冻结孔水害治理工程为实例,分析了冻结孔环状导水通道生成及涌水机理,进而提出一种创新性的逆流引流注浆封堵技术,并介绍了该技术的原理及施工工艺。工程实践证明,该技术能高效快速治理冻结孔涌水水害。 |
中文关键词:冻结井筒 冻结孔涌水 环状导水通道 逆流引流注浆 |
|
In-rushing Water Mechanism of Freezing Hole of Frozen Shaft and Counter-flow Water Diversion Grouting Sealing Technology |
|
|
Abstract:In order to solve the water disasters caused by freezing holes of full-depth bedrock frozen shaft in western China, analysis was made on the form of annular water-transmitting channels in freezing holes and the in-rushing water mechanism with the case of water disasters control project of Hujiahe coal mine. The paper presents an innovating counter-flow water diversion grouting sealing technology and introduced its principle and construction process. The project practice proved that this technology can effectively and quickly control the in-rushing water disaster of freezing hole. |
keywords:frozen shaft in-rushing water of freezing hole annular water-transmitting channel counter-flow water diversion grouting |