长沙冰雪大世界高陡边坡锚索钻孔施工关键技术 |
投稿时间:2016-05-12 修订日期:2016-08-26 点此下载全文 |
引用本文:周伏良,刘运思,赖咸根,等.长沙冰雪大世界高陡边坡锚索钻孔施工关键技术[J].钻探工程,2016,43(10):53-55.ZHOU Fu-liang,LIU Yun-si,LAI Xian-gen,et al. Key Technology of Anchor Cable Drilling Construction in High and Steep Slope of Changsha Ice and Snow World[J]. Drilling Engineering, 2016,43(10):53-55. |
摘要点击次数: 875 |
全文下载次数: 699 |
|
基金项目:湖南省自然科学基金(编号:2015JJ6038)、湖南省教育厅一般项目(编号:15C0555)赞助 |
|
中文摘要:长沙冰雪大世界锚索施工过程中遇到不良地质情况,钻孔施工难度大,成孔困难。针对不良地质情况施工过程存在的问题,提出了钻孔过程中出现不良地质情况的评判依据,并分别对钻孔遇见卡孔、塌孔、渗水、岩溶及断层进行了处治,现场处治效果良好。 |
中文关键词:高陡边坡 不良地质情况 锚索 钻孔 卡孔 渗水 |
|
Key Technology of Anchor Cable Drilling Construction in High and Steep Slope of Changsha Ice and Snow World |
|
|
Abstract:Unfavorable geological conditions were encountered in anchor cable construction for Changsha Ice and Snow World, it was difficult for drilling and hole completion. In view of the construction difficulties under poor geological conditions, the poor geological conditions evaluation basis were put forward, the treatment of pipe-sticking, hole collapse, water seepage, karst and fault were carried out in the drilling process with good effects. |
keywords:high and steep slope bad geological conditions anchor cable drilling stuck in a hole water seepage |
查看全文 查看/发表评论 下载PDF阅读器 |