中文摘要:文中介绍了四川省地质灾害治理工程概(预)算标准人工费动态化、材料运输、取费标准、施工技术、项目管理等特点,通过典型案例列举了标准存在的主要问题,如营业税改征增值税、治理工程预算定额部分定额消耗量不符合行业实际消耗水平、勘查设计标准规定不够完善、投资估算计算方法过于复杂、工程量计算规则不够完善、小型临时设施和施工临时工程需进一步区分等,最后根据上述问题提出了修订编制与审查规定、工程施工机械台时费定额、治理工程预算定额、勘查设计预算标准、工程量计算规则的构想。
中文关键词:地质灾害治理工程  概(预)算定额  修订  四川省
 
Application and Revising Conception of Budgetary Estimate (Budget) Standards of Geological Hazard Control Projects in Sichuan Province
Abstract:This paper introduces the characteristics of budgetary estimate (budget) standards of the geological hazard control project of Sichuan province, such as the dynamic of labor cost, material transportation, charge standard, construction technology and project management. The main problems existing in the standard are enumerated through typical cases, such as the business tax is replaced by value added tax, partial quota consumption of the budget quota of the treatment project isn’t in line with the actual consumption level of the industry, the specification of the exploration and design standards is not perfect, the calculation method of investment estimation is too complex, the calculation rules of the engineering quantity are not perfect, the construction of small temporary facilities and temporary works should to be further differentiated. According to the above problems, the conception of revising the compilation and review provisions, the unit/time/fee quota of the construction machinery, budget quota of the treatment project, the standard of the survey and design budget and the calculation rules of the engineering quantity are put forward.
keywords:geological hazard treatment project  budgetary estimate (budget) quota  revising  Sichuan Province