页岩储层层间暂堵转向工艺技术研究
作者:
作者单位:

大庆油田有限责任公司井下作业分公司

作者简介:

通讯作者:

中图分类号:

TE357

基金项目:


Research on inter-layer temporary plugging steering process technology for shale reservoirs
Author:
Affiliation:

Downhole Operation Branch of Daqing Oilfield Company Ltd., Daqing Heilongjiang 163453, China

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    针对大庆古龙页岩油储集层页理发育丰富,水平渗透率低,垂向无法流动等特点,需通过暂堵转向压裂技术增大净压力,利用暂堵颗粒封堵炮眼迫使压裂液转向,进一步提高裂缝复杂程度。本文通过分析暂堵颗粒在井筒以及炮眼附近的受力与暂堵前后压力变化,提出暂堵颗粒运动方程,建立评价暂堵颗粒坐封效果的两个参数,制定暂堵转向评价标准,形成了暂堵颗粒用量设计方法,研究页岩油试验区水平井压裂施工中暂堵颗粒的封堵效果。现场试验结果显示暂堵有效率达到66.7%,坐封效率达到74%,暂堵颗粒效率达到34%,暂堵后裂缝起裂位置或延伸方向明显不同,炮眼封堵有效,实现了压裂转向的目的,为今后页岩油储集层压裂改造提供理论支撑。

    Abstract:

    In response to the characteristics of Daqing Gulong Shale-type reservoirs such as rich phyllite, low horizontal permeability and inability to flow in the vertical direction, it is necessary to increase the pure pressure by temporary plugging steering fracturing technology. The degree of fracture complexity is further increased using the temporary particles to seal the borehole and force the fracturing fluid to turn. This paper analyzes the force and pressure changes of temporary plugging particles in the wellbore and near the shot-holes before and after temporary plugging, proposes the equation of motion of the temporary plugging particles, establishs two parameters to evaluate the setting effect of temporary plugging particles, sets the standard to evaluate the temporary plugging steering, develops the dosage design method of temporary plugging particles, and studies the sealing effect of temporary plugging particles in the process of fracturing construction for horizontal wells in shale oil test area. The field test results show that the efficiency of temporary plugging reached 66.7%, the setting efficiency reached 74% and the temporary plugging particle efficiency reached 34%. The fracture initiation position or extensive direction is obviously different after temporary plugging, the shot-hole sealing is effective, and the purpose of fracture steering is realized, which provides theoretical support for the future work of fracturing for shale oil reservoirs.

    参考文献
    相似文献
    引证文献
引用本文

徐浩,袁菁华,胡康存.页岩储层层间暂堵转向工艺技术研究[J].钻探工程,2023,50(4):127-134.
XU Hao, YUAN Jinghua, HU Kangcun. Research on inter-layer temporary plugging steering process technology for shale reservoirs[J]. Drilling Engineering, 2023,50(4):127-134.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2022-10-26
  • 最后修改日期:2023-06-16
  • 录用日期:2023-06-16
  • 在线发布日期: 2023-07-20
  • 出版日期: 2023-07-10
×
《钻探工程》期刊采编系统正在进行升级改版,部分功能正在逐步完善,在此期间给大家的使用带来不便,敬请谅解。