寨上金矿复杂地层深孔岩心钻探技术
作者:
作者单位:

1.中国地质调查局西安矿产资源调查中心,陕西 西安 710100;2.安徽省地质矿产勘查局313地质队,安徽 六安 237010

作者简介:

通讯作者:

中图分类号:

P634

基金项目:

中国地质调查局地质调查项目“西秦岭岷县寨上金矿勘查”(编号:ZD20220314)


Deep hole core drilling technology in complex formation of Zhaishang gold deposit
Author:
Affiliation:

1.Xi’an Center of Mineral Resources Survey, China Geological Survey, Xi’an Shaanxi 710100, China;2.313 Geological Team, Bureau of Geology and Mineral Exploration of Anhui Province, Lu’an Anhui 237010, China

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    ZK4816孔是首个在岷县寨上金矿区实施的千米以深钻孔。针对矿区复杂地层钻进难、护壁难等问题,通过实施深孔岩心钻探工程,同步开展了钻探技术研究与实践,成功应用了广谱冲洗液、加大口径钻具、定向钻进等技术措施,钻进深度达到1172.88 m。广谱冲洗液与植物胶冲洗液相比护壁周期提高了3倍,采用加大口径钻具钻进可形成大环状间隙,大幅提升冲洗液携带粗颗粒岩粉的能力,“广谱冲洗液+加大口径钻具”技术的应用有效保证了深孔施工。为下一步复杂地层深孔岩心钻探工作提供了参考依据。

    Abstract:

    ZK4816 borehole is the first drilling with a depth of 1000 meters implemented in Zhaishang gold deposit area, Min County. For the problems of difficult drilling, wall protection etc. in complex formation of mining area, through the implementation of deep core drilling project, drilling technology research and practice were carried out simultaneously, and technical measures such as GSP drilling fluid, enlarged diameter drilling tools and directional drilling were successfully applied. The drilling depth reached 1172.88m. The wall protection period of GSP drilling fluid was three times longer than that of natural plant gum drilling fluid. Drilling with enlarged diameter drilling tools can form a large annular gap and greatly improve the ability of drilling fluid to carry coarse rock powder. The application of “GSP drilling fluid & enlarged diameter drilling tools” technology effectively ensures the deep hole construction. This paper provides a reference for the next deep core drilling work in complex strata.

    参考文献
    相似文献
    引证文献
引用本文

刘蓓,蔡正水,杨可,等.寨上金矿复杂地层深孔岩心钻探技术[J].钻探工程,2023,50(S1):240-245.
LIU Bei, CAI Zhengshui, YANG Ke, et al. Deep hole core drilling technology in complex formation of Zhaishang gold deposit[J]. Drilling Engineering, 2023,50(S1):240-245.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2023-03-15
  • 最后修改日期:2023-05-23
  • 录用日期:2023-05-30
  • 在线发布日期: 2023-10-21
  • 出版日期:
×
《钻探工程》期刊采编系统正在进行升级改版,部分功能正在逐步完善,在此期间给大家的使用带来不便,敬请谅解。