5/27/2025, 8:48:51 PM 星期二
Home
About Journal
Business News
Editorial Board
Instruction for Author
Contents Download
Academic Forum
Ethics Statement
Contact Us
中文
Home
>
Archive
>
Volume , Issue 6, 2002
>22-23,26
Online First
PDF
HTML
XML
Export
Cite reminder
How to Increase the Performance Life of Cable of Rotary-digging Drills
DOI:
CSTR:
[cstr]
Author:
Find this author on All Journals
Find this author on BaiDu
Search for this author on this site
Affiliation:
Clc Number:
P634.3
Fund Project:
Article
|
Figures
|
Metrics
|
Reference
|
Related [20]
|
Cited by
|
Materials
|
Comments
Abstract:
Key words:
旋挖钻机,钢丝绳,使用寿命
Reference
Related
[1]
陈辉,杨明友.
How to Increase the Performance Life of Cable of Rotary-digging Drills
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2002(6):22-23,26.
[2]
Li Yanfang.
How to Advocate the Spirit of Devotion to Work
[J].China Inestigation & Design,2001(11):35-36.
[3]
LI Yu-wen,XU Zhong-min.
Study of How to Assess the Performance of the Grain for Green Project in Oases of Arid Regions:A Case Study in Zhangye Municipality
[J].Journal of Glaciology and Geocryology,2009,31(3):546-552.
[4]
Naser AGH.
How to save the dying Lake Urmia
[J].Acta Geologica Sinica (English Edition),2014,88(Z1):178-179.
[5]
朱岐武,张小军,刘俊卿,赵信峰.
How to Increase Water Resources Utilization Efficiency
[J].Hydrology,2007,27(4):28-30.
[6]
Ran Hengqian,Xie Jianqing.
Application of the Grey Theory to the Optimized Design of Prestressed Cable Bolt
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,1998(1):11-13.
[7]
吴应当.
Research on the small-Bore Drill of Rotary Drill
[J].China Inestigation & Design,2004(7):39-40.
[8]
Zhang Lin.
How to Make up Management Performance Assessment System in Geological Exploration Unit
[J].Coal Geology of China,2006,18(5):64-66,69.
[9]
Janja Kogovšek,Metka Petrič.
Increase of vulnerability of karst aquifers due to leakage from landfills
[J].Environmental Earth Sciences,2013,70(2):901-912.
[10]
YU Wan-chun.
How to Accelerate Development of the Grass-Roots Hydrologic Services
[J].Hydrology,2007,27(6):94-96.
[11]
Shi Zikuan.
Technical Measures to Increase Construction Benefit of Tunnelling Projects
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,1997(2):49-52.
[12]
KONG Wei,DUAN Xin-sheng,LIU Zhao-yang,HU Han-jun.
Analysis on Influence of Withdraw Speed of Rotary Drilling Rig to Borehole Stability
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2008,35(1):55-57.
[13]
吴志煊.
Increase the total strength in the design enterprise and keep to the view of sustained development
[J].China Inestigation & Design,2006(8):58-59.
[14]
XIAO Jun-hua,SUN Jian-ping.
Study of the calculation of plastic zone around the vertical digging hole for building rectification
[J].Rock and Soil Mechanics,2020,41(12):4073-4077.
[15]
DENG Shao-dong.
Application of Anchor Cable and Pile to the Renovation on Road Side Slope
[J].Guizhou Geology,2005,22(4):296-300.
[16]
CHEN Jun-qing,JIANG Zhen-xue,PANG Xiong-qi,PANG Hong,JIANG Fu-jie.
An New Method Applied to Analyzing the Unsuccessful Drills:Take the Cambrian in the Platform of the Tarim Basin as an Example
[J].Geoscience of Geosciences,2013(5).
[17]
LI Fangzhen.
The Application of Rotary Drilling to Marine Sedimentary Strata
[J].City Geology,2009,4(4):44-47.
[18]
孙新胜,王新锋王辉.
Application of timbering with tubular prop to in-mine roadway digging
[J].Coal Geology & Exploration,2005,33(Z1):39-41.
[19]
Wang Xuzhen,Chen Yi.
Considerations on Conversion of Core Drills to Construction Drills
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,1994(5):23-25,28.
[20]
王伟.
Prevention and Treatment of Bury Drills During Rotary Drilling
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2004,31(8):21-22.
Cited by
Comments
Comments
分享到微博
Submit
Get Citation
Copy
Share
0
Article Metrics
Abstract:
975
PDF:
296
HTML:
181
Cited by:
0
History
Received:
Revised:
June 11,2002
Adopted:
Online:
Published:
November 25,2002
Article QR Code