6/23/2025, 5:26:10 PM 星期一
Home
About Journal
Business News
Editorial Board
Instruction for Author
Contents Download
Academic Forum
Ethics Statement
Contact Us
中文
Home
>
Archive
>
Volume 33, Issue 7, 2006
>41-42,45
Online First
PDF
HTML
XML
Export
Cite reminder
Practice of Water Stoppage by Surface Grouting in the First Auxiliary Shaft of Wangfenggang Mine
DOI:
CSTR:
Author:
Find this author on All Journals
Find this author on BaiDu
Search for this author on this site
Affiliation:
Clc Number:
TD265.48
Fund Project:
Article
|
Figures
|
Metrics
|
Reference
|
Related [20]
|
Cited by [0]
|
Materials
|
Comments
Abstract:
Key words:
望峰岗矿井
;
井筒
;
注浆
;
堵水
Reference
Related
[1]
DING Tong-fu.
Practice of Water Stoppage by Surface Grouting in the First Auxiliary Shaft of Wangfenggang Mine
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2006,33(7):41-42,45.
[2]
YIN De-zhan,JIANG Duo-ru and YANG Bao-lin.
Application of Pressure Grouting in Auxiliary Shaft and Ventilation Shaft
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2014,41(6):72-76.
[3]
ZHAO Shu-mei,JIA Li-qin,WANG De-qiang and DING Kun.
Application Practice of Ground Grouting for Water Blocking in Jindi Iron Mine
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2009,36(2):59-60,63.
[4]
WANG Bing,WANG Zhi-xiang,DONG Mei and LI Hong-wei.
Construction Practice of Freezing Borehole in an Auxiliary Shaft
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2011,38(4):53-57.
[5]
ZHANG Hong.
Open Water Grouting Technique of Mine
[J].Coal Geology of China,2003,15(1):39-40,50.
[6]
Zhang Chunfeng, Qiao Jun and Sun Guisheng.
Application of Grouting Technique in Underground Mine Water Bursting Prevention
[J].Coal Geology of China,2007,19(A01):65-66,75.
[7]
李巨龙,于宗仁,夏建军.
Technique of Grouting in Remaining Water Proof Coal Column in Xiezhuang Coal Mine
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2004,31(2):18-20.
[8]
DUAN Ming-f,LIU Yu-rui,WU Qing-xing.
Construction Practice on Design for Shaft Face Grouting in a Gypsum Mine in Henan
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2007,34(5):27-29.
[9]
康凤群.
Prediction of Water Inrush in Seam Floor in Huangjiopu Mine Shaft by the Method of Mathematical Hydrogeology
[J].Coal Geology & Exploration,1985,13(5):38-40.
[10]
张明龙.
Analysis on Breakage of the Southern Secondary Shaft in Wushan Copper Mine and Grouting Reinforement for the Shaft
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2001(6):3-5.
[11]
杨裕恩,任有仓,李保平.
Water Blocingk-off Method for the Cemented Grouting Coal Mine Drift
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2002(2):14-15.
[12]
Yin Wancai.
Water Prospecting Pioneer Grouting Operation Technology in Deep Shaft Basement Sector with Thick Overburden
[J].Coal Geology of China,2014(11):48-50.
[13]
XU Qing-hai,BAI Bao-yun,YAN De-jin and WANG ning.
Application of Curtain Grouting Technology for Ventilating Shaft Disease Control in Soluble Potassium Salt Mine
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2018,45(7):84-86,83.
[14]
JI Zhong-kui.
Grouting and Water Blocking Technology under Complex Conditions of Water Inrush in Coal Mine
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2014,41(5):61-65.
[15]
Guo Jingchao,Li Xinwen and Liu Wei.
Application of Flow Attenuation Analysis in Mine Workings Water Block-up Grouting
[J].Coal Geology of China,2005,17(2):18-20.
[16]
CUI Xue-yu,ZHAO Han-ying,PAN Tao and LI Ming.
Grouting Treatment on Upper Inclined Shaft of Water Diversion System in Ancient Weathering Crust
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2008,35(12):28-34.
[17]
CAO Zu-bao,SHAO Hong-qi and ZHU Ming-cheng.
In-rushing Water Mechanism of Freezing Hole of Frozen Shaft and Counter-flow Water Diversion Grouting Sealing Technology
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2012,39(8):46-49.
[18]
Sun Jiaying,Xie Changlun,Huang Ping , Xie Yan.
Transmissibility Analysis of Fault512 in Banji Coalmine and Surface Grouting Practice
[J].Coal Geology of China,2010(7):31-35.
[19]
Yang Shenglun,Liu Huizhou.
Application of Transient Electromagnetic Method(TEM)Prospecting in Mine Water Plug-back Grouting
[J].Coal Geology of China,2021(3):48-52.
[20]
Dong Mei,Li Hongwei,Zhang Yong,Wang Xinjian.
Main Shaft Grouting Reinforcement Engineering Practice in Banji Coalmine, Huainan Coalfield
[J].Coal Geology of China,2013,25(4).
Cited by
[1]
汪敏华,丁同福.
Water Flow Features of Aquifer in Mine Auxiliary Shaft of Zhuji Mine and Control Countermeasures
[J].Coal Science and Technology,2012,40(11).
[2]
WANG Minhua , DING Tongfu.
Technique of water inflow control of full shaft section of constructed vertical shaft
[J].Coal Geology & Exploration,2012,40(2):67-70,74.
[3]
DING Tong-fu,WANG Min-hua.
Application of double Y Shape S hole in surface advance grouting of shaft
[J].Coal Science and Technology,2007,35(9):43-44.
Comments
Comments
分享到微博
Submit
Get Citation
Copy
Related Videos
Share
0
Article Metrics
Abstract:
1019
PDF:
319
HTML:
180
Cited by:
0
History
Received:
January 23,2006
Revised:
January 23,2006
Adopted:
Online:
Published:
Article QR Code