Drilling Technique and Study for National Grade One Shaft with Multi-layer Underground Water Demonstration Monitoring Well
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

TU991.12

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    According to the construction experience and concrete requirements of the project,design and construction were implemented for national grade one shaft with multi-layer underground water demonstration monitoring well for the first time,and a new technology,PVC-U plastic tube 'open hole well completion by four times',was adopted.The paper detailed the design,concrete technical measures and the final achievement.

    Reference
    Related
    Cited by
Get Citation
Related Videos

Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:January 10,2007
  • Revised:January 10,2007
  • Adopted:
  • Online:
  • Published:
Article QR Code