6/27/2025, 8:10:12 AM 星期五
Home
About Journal
Business News
Editorial Board
Instruction for Author
Contents Download
Academic Forum
Ethics Statement
Contact Us
中文
Home
>
Archive
>
Volume 35, Issue 5, 2008
>58-59
Online First
PDF
HTML
XML
Export
Cite reminder
Construction Technique of Underwater Cast-in-place Pile with Platform in Siphon Project of Xijiao Water Plant of Guiyang City
DOI:
CSTR:
Author:
SHEN Hui,LIU Gang
SHEN Hui,LIU Gang
Find this author on All Journals
Find this author on BaiDu
Search for this author on this site
Affiliation:
Clc Number:
TU473.14
Fund Project:
Article
|
Figures
|
Metrics
|
Reference
|
Related [20]
|
Cited by
|
Materials
|
Comments
Abstract:
贵阳市西郊水厂虹吸管工程大部分属水下施工,施工难度较大.总结了该工程水下灌注桩施工中的一些经验.
Key words:
钻孔灌注桩
;
施工平台
;
钻孔护筒
;
拆除爆破
;
阳西
;
贵阳市西郊水厂
;
虹吸管
;
工程
;
平台
;
水下灌注桩
;
施工技术
;
Guiyang City
;
Water Plant
;
Project
;
Platform
;
Pile
;
Technique
;
灌注桩施工
;
施工难度
;
水下施工
;
分属
Reference
Related
[1]
SHEN Hui,LIU Gang.
Construction Technique of Underwater Cast-in-place Pile with Platform in Siphon Project of Xijiao Water Plant of Guiyang City
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2008,35(5):58-59.
[2]
ZHANG Lei.
Construction Technique of Ram-compaction Cast-in-place Pile in a Residential District of Langfang City
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2008,35(5):52-53.
[3]
JIN Cheng-wen,YAN Jun,LIU Ji-dong.
Application of Construction Technology for Super-flowing Long Auger Bored Cast-in-place Pile in Project of Administration Center of Rikaze City
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2008,35(3):42-44.
[4]
LI Shi-jing,CHEN Hong-ru.
Construction Technique of Large Diameter Under-reamed Bored Cast-in-place Pile in Macao Meigaomei Golden Palace
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2006,33(12):5-8.
[5]
CHENG Jin-xi,ZHANG Gui-xiu,HUANG Xin-feng,YU He-kun and CHEN Hui.
Construction Technique of Testing Pile for a High-rise Building in Core Area of Beijing CBD
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2012,39(11):69-71,74.
[6]
CHEN Gong-ke.
An Approach to Design Principle and Construction Technique of Pile Foundation in Karst Region
[J].Acta Geologica Sichuan,2013(1):87-89.
[7]
LUO Qi-lu,Co.,Lt,Zhuozhou Hebei,China.
Construction Technique of Working with Water in Subway Tunnel
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2007,34(3):58-60.
[8]
Lu Huiquan Jin Qingshan Wang Wei.
Analysis on Lower Bearing Capacityof Bore Cast - in - place Pile with a Major Diameter in Shanghai Soft Soil Area
[J].Shanghai Land & Resource,1997(4):15-18.
[9]
XIE Qiu-ming.
Construction Method of Static Pressure Tube Pile with Hole-drilling by Water Jetting
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2008,35(5):56-57.
[10]
宁晋生,郭建国,习胜强.
Analyses of Boring Pile Construction Technique in Water Pressure Bearing Formations
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2003,30(6):8-9,12.
[11]
MAO Guang-ling.
Construction Technique for Bored Pile Foundation in IX-B Contract Section of Hangzhou Bay Cross-sea Bridge
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2007,34(5):20-23.
[12]
万金山.
Goal-direct Management for Aeration Deposition-pool Project of Sewage-purification Plant in North of Nanjing City
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2002(6):54-55.
[13]
ZHANG Shu-juan and LI Hong-chang.
Construction Technology of Post-grouting Bored Pile for Xiangluowan Project of Sinosteel in Tianjin
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2014,41(3):68-72,79.
[14]
ZHANG Zhi-chun,CHENG Miao-de,HE Jian-ming and DENG Cheng-yi.
Application of Secant Pile in Formation with Confined Water
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2008,35(9):45-47.
[15]
LI Fu-fa and CHEN Qiang.
Construction Technology of City Underground Pass in Rich Water Sands
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2005,32(10):50-52.
[16]
ZHAO Shen-zhong,YANG Chun,SONG.
Application of Ultra-deep Cement-soil Mixed Pile in Deep Confined Water Partition Project
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2011,38(9):86-89.
[17]
付廷红.
Application of Cantilever Platform in Bored Pile Construction for the Dock Renovation
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2001(3):29-29.
[18]
WEI Hongmin,XU Bingxin,YANG Junge.
Application of Pipe Jacking Technology in Water Level Self-recording Platform Construction
[J].Hydrology,2013,33(3):77-79.
[19]
LI Yi and DENG Shu-mi.
Construction Technology of Aqueduct Pile Foundation for South to North Water Transfer Project in Nanyang
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2013,40(1):57-61.
[20]
LI Xiao-qing,ZHU Chuan-cheng.
Study on Technique of the Aquatic Construction Platform for Pile Foundation
[J].Exploration Engineering:Rock & Soil Drilling and Tunneling,2007,34(8):31-36.
Cited by
Comments
Comments
分享到微博
Submit
Get Citation
Copy
Related Videos
Share
0
Article Metrics
Abstract:
1170
PDF:
1142
HTML:
225
Cited by:
0
History
Received:
Revised:
Adopted:
Online:
Published:
Article QR Code