Construction Technology of Hole Deviation Control for Horizontal Pre-stressed Anchor in the Underground Powerhouse System of Jinping First Stage Hydropower Station
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Reinforced support was made for the side wall, altered rock and large fault of the main engine compartment, main transformer room and bus cavern in underground powerhouse of Jinping 1 hydropower station by the horizontal pre-stressed anchor. In the construction process of pre-stressed horizontal anchor, according to the different geological formations, hole deviation was basically solved by strict control methods with continuous improvement.

    Reference
    Related
    Cited by
Get Citation
Related Videos

Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:March 30,2010
  • Revised:March 30,2010
  • Adopted:April 14,2010
  • Online: November 24,2010
  • Published: November 25,2010
Article QR Code