Technical Problems in Long Spiral CFG Pile Construction
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

TU473

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In long spiral CFG pipe construction, attention should be paid on pile position control, pile foundation construction, concrete quality, construction measures in winter, thickness of cushion and protection after pile-forming to avoid appearing quality problems. The experience summary and the discussion on above issues were made in this paper.