Technical Difficulties in Large Diameter Well Drilling in Coal Mine Construction and the Countermeasures
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Based on a well drilling engineering of a mine in Shandong, the paper introduced the advantages and difficulties of construction without surface casing drilling with the countermeasures. The construction of 2 wells were fulfilled ahead of time through deviation control by tower drilling tools, inclination survey by gyro inclinometer, wall protection by high-quality mud and working intensity reducing by buoyancy device and impact wrench. Drilling without surface casing greatly saved the construction cost.

    Reference
    Related
    Cited by
Get Citation
Related Videos

Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:May 13,2010
  • Revised:May 13,2010
  • Adopted:October 27,2010
  • Online: December 28,2010
  • Published: December 25,2010
Article QR Code