Instance of Casing Milling Process for the Wall-sticking in Geothermal Well
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

P634.8

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Wall-sticking and sand bridging happened in the geothermal well drilling construction in Huaiyang of Henan. After pulling, natron infiltrating and blasting, there were still several pieces of drilling tool remained; and finally the remained tools were taken out by casing milling. This experience can be reference to the similar engineering.