Institute of Exploration Technology, CAGS,Faculty of Engineering, China University of Geosciences
Clc Number:
P634.5 6
Fund Project:
Article
|
Figures
|
Metrics
|
Reference
|
Related
|
Cited by
|
Materials
|
Comments
Abstract:
By the force analysis on core barrel in hydro-hammer coring drilling process, this paper discusses the action mechanism of reducing core blockage in hydro-hammer drilling. In addition, the applicable stratum range for hydro-hammer drilling are clarified and the results achieved during the drilling operation for the hole WFSD-4 of Wenchuan earthquake fault scientific drilling project are introduced.