Cutter Inspection/Replacement in Cabin with Pressure for River Channel Construction by Large Diameter Shield
Author:
Affiliation:

China Railway Tunnel Group Limited Company of Hangzho

  • Article
  • | |
  • Metrics
  • |
  • Reference [5]
  • |
  • Related [1]
  • | | |
  • Comments
    Abstract:

    In long distance tunneling with large diameter air cushion slurry balance shield machine under different geological conditions, different degrees of wear on shield machine cutter will be produced; especially in sand and gravel based formation, the formation with excessive level of quartz and soft & hard formation, the cutter head and cutter are more easy to be worn. In order to ensure the safe use of shield machine cutter head, inspection and replacement of edge cutter and center cutter often should be done according to the different wear standards in the cabin with pressure. With an engineering case of cutter inspection/replacement in cabin with pressure for river channel construction, the paper summed up the construction technology of cutter inspection/replacement in cabin with pressure for large diameter shield.

    Reference
    [1]竺维彬,鞠世健.复合地层中的盾构施工技术[M].中国科学技术出版社:北京,2005.
    [2]郭信君,闵凡路,钟小春,朱伟.南京长江隧道工程难点分析及关键技术总结[J].岩石力学与工程学报,2012,31(10):2154-2160.
    [3]曹文宏,中伟强等.超大特长盾构法-上海长江隧道工程设计[M].中国建筑工业出版社,北京:2010.
    [4]张凤祥,朱合华,傅德明.盾构隧道[M].人民交通出版社,北京:2004.
    [5]陈馈,洪开荣等.盾构施工技术[M].人民交通出版社,北京:2009.
    Cited by
    Comments
    Comments
    分享到微博
    Submit
Get Citation
Share
Article Metrics
  • Abstract:987
  • PDF: 1329
  • HTML: 202
  • Cited by: 0
History
  • Received:March 10,2014
  • Revised:March 10,2014
  • Adopted:May 04,2014
  • Online: May 28,2014
Article QR Code