    Abstract:

    Based on the requirements of green geiological exploration, this article mainly introduces the drilling technical characteristics and application advantages of portable modular drill. The application effect of the drill is analyzed based on 30 drilling holes in different kinds of geological conditions. The drilling technical methods are explored integrating the portable modular rig, the efficient rock crushed thin wall bit and the green drilling fluid, as a result improving the drilling quality and efficiency, reducing the adverse impact of the engineering activities on the natural environment, obtaining a better social and economic benefits. At the same time, the environmental protection and treatment measures in engineering activities are explored, and the management issues of green exploration work is discussed. At last, some suggestions are put forward for the wide application of drilling rig in the future, which provide a better guiding significance for the continuous promotion of green geological exploration work.

    Table 1 Current standard of green geological exploration in China
    Table 4 Diamond bit tests
    Table 2 Performance parameters of EP600 series drilling rig
    Table 3 Working efficiency of portable modular drill in different working area
    Fig.1 Cutting area comparison between different series drill bits
    Fig.2 Comparison of different series core diameter
    Fig.3 Comparison between different series drill rod and hole wall annular gap
    Fig.4 Drill working site
    Fig.5 Application of portable modular drill
    Fig.6 Main lithology in the working area
    Fig.7 Temporary land recovery result
    Reference
    Related
    Cited by
Get Citation
Related Videos

Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:December 27,2021
  • Revised:February 21,2022
  • Adopted:February 24,2022
  • Online: April 29,2022
  • Published: March 10,2022
Article QR Code