6/24/2025, 1:34:41 AM 星期二
Treatment of casing unscrewing in ZK27A07 hole of Baijian Iron Mine
Author:
Affiliation:

1.No.9 Geology Team, Hebei Provincial Bureau of Geology and Mineral Resources, Xingtai Hebei 054000, China;2.Hebei Geological Exploration Institute of Sinochem General Administration of Geology and Mines,Shijiazhuang Hebei 050031, China

Clc Number:

P634.8

  • Article
  • | |
  • Metrics
  • |
  • Reference [15]
  • |
  • Related [2]
  • | | |
  • Comments
    Abstract:

    Two large karst caves containing confined water were encountered during drilling of ZK27A07 borehole for Baijian iron ore exploration in Shahe City, Hebei Province. In the placement process of ?89mm casing, the casing unscrewed and fell downhole. In the process of accident treatment, the casing fell downhole again, with fishing tools breakingoken and falling downhole for several times, forming a superposition of multiple movable accident heads in the karst cave. We successfully handled the casing falling accident by casting concrete and natural by-pass drilling, so as to avoid scrapping the drilling hole. In this paper, the whole process of accident treatment is described in detail. Through careful analysis of the process and causes of the accident, the specific method is presented for safe placement of the casing string with excessive length and overweight. At the same time, how to realize reliable borehole wall sealing with the casing string in drilling through multiple karst caves containing confined water is discussed, which is intended to provide reference for similar projects.

    Reference
    [1] 周光灿.钻探孔内事故预防与处理一百例[M].北京:地质出版社,1986:84-102.ZHOU Guangcan. One Hundred Cases of Accident Prevention and Treatment in Drilling Hole[M]. Beijing: Geological Publishing House, 1986:84-102.
    [2] 杨芳,陈师逊.深部地质钻探钻孔结构设计与施工分析[J].探矿工程(岩土钻掘工程),2019,46(11):21-26.YANG Fang, CHEN Shixun. Drilling structure design and construction analysis of deep geological drilling[J]. Exploration Engineering (Rock & Soil Drilling and Tunneling), 2019,46 (11): 21-26.
    [3] 李红梅,石逊.白涧铁矿南区复杂地层钻探施工技术[J].钻探工程,2021,48(11):30-35.LI Hongmei, SHI Xun. Drilling technology for complex formation in the south area of Baijian Iron Mine[J]. Drilling Engineering, 2021,48(11):30-35.
    [4] 张国财.漠河煤系地层取心钻探施工技术[J].地质装备,2016,17(3):37-39.ZHANG Guocai. Construction technology of coring drilling in Mohe coal measure strata[J]. Equipment for Geotechnical Engineering, 2016,17 (3):37-39.
    [5] 陈金照.金刚石绳索取心钻探工艺技术在九龙川井田的应用研究[J].能源与环境,2013(5):44-45,47.CHEN Jinzhao. Application of diamond rope coring drilling technology in jiulongchuan mine field [J]. Energy and Environment, 2013(5):44-45,47.
    [6] 王盛,潘振泉,秦正运.小口径绳索取心钻进在砀山地区深厚泥岩地层中的施工技术[J].钻探工程,2022,49(2):85-90.WANG Sheng, PAN Zhenquan, QIN Zhengyun. Small diameter wireline core drilling for deep mudstone formation in Dangshan area[J]. Drilling Engineering, 2022,49(2):85-90.
    [7] 周亚利,孙姿禄,熊先峰.煤系地层钻探施工技术措施[J].吉林地质,2010,29(4):108-110.ZHOU Yali, SUN Zilu, XIONG Xianfeng. Technical measures for drilling in coal measure strata [J]. Jilin Geology, 2010,29(4):108-110.
    [8] 李智深.套管事故预防及处理技术分析研究[J].中国石油和化工标准与质量,2022,42(3):172-173.LI Zhishen. Analysis and research on casing accident prevention and treatment technology[J]. China Petroleum and Chemical Standard and Quality, 2022,42(3):172-173.
    [9] 董保华.浅谈地质钻探过程中套管事故的原因及处理[J].世界有色金属,2021(7):202-203.DONG Baohua. Causes and treatment of casing accidents in geological drilling[J]. World Nonferrous Metals, 2021(7):202-203.
    [10] 周子棠.下套管作业过程要点探析[J].内蒙古石油化工,2015,41(3):75-77.ZHOU Zitang. Discussion on key points of casing running operation[J]. Inner Mongolia Petrochemical Industry, 2015,41(3):75-77.
    [11] 曹晓彦.断套管事故处理思路与方法[J].内江科技,2014,35(6):65-66.CAO Xiaoyan. Treatment ideas and methods of casing breaking accident[J]. Neijiang Science & Technology, 2014,35(6):65-66.
    [12] 田志超.水力内割刀在中国东部海区科学钻探套管卡阻事故处理中的应用[J]. 探矿工程(岩土钻掘工程),2020,47(3):75-79.TIAN Zhichao. Application of the hydraulic internal cutter in the treatment of casing sticking in scientific drilling in the Eastern Sea of China[J]. Exploration Engineering (Rock & Soil Drilling and Tunneling), 2020,47(3):75-79.
    [13] 聂新明.过采空区成井工艺及固井措施[J].化工矿产地质,2018,40(4):247-251.NIE Xinming. Well completion technology and cementing measures over goaf[J]. Geology of Chemical Minerals, 2018,40(4):247-251.
    [14] 李砚智,张长茂,张平.漏失量较大地层“戴帽”固井技术[J].探矿工程(岩土钻掘工程),2019,46(7):41-44,50.LI Yanzhi, ZHANG Changmao, ZHANG Ping. Top fill cementing technology for large loss formation[J]. Exploration Engineering (Rock & Soil Drilling and Tunneling), 2019,46(7):41-44,50.
    [15] 钱书伟,王如春.岩心钻探水下灌注水泥方法探讨[J].探矿工程(岩土钻掘工程),2009,36(1):18-21.QIAN Shuwei, WANG Ruchun. Discussion on underwater cement pouring method of core drilling [J]. Exploration Engineering (Rock & Soil Drilling and Tunneling, 2009,36(1):18-21.
    Cited by
    Comments
    Comments
    分享到微博
    Submit
Get Citation
Share
Article Metrics
  • Abstract:591
  • PDF: 918
  • HTML: 1086
  • Cited by: 0
History
  • Received:May 20,2022
  • Revised:July 15,2022
  • Adopted:July 18,2022
  • Online: December 05,2022
  • Published: November 10,2022
Article QR Code