  • 1  Pondering over Gas Hydrates Exploration Drilling
    LI Chang-mao GENG Rui-lun
    2000(3):5-8.
    [Abstract](1088) [HTML](180) [PDF 179.09 K](239) [Cited by](14)
    Abstract:
    The forming, stable condition, distribution and oversea research tendency of gas hydrates are briefly introduced in this paper, and the function and technology problems of exploration drilling of gas hydrates are elaborated, and the working thinking of exploration boring of gas hydrates in China is presented.
    2  Selection of Auger Boring Rigs and Problems with Them in Construction
    王平 赵永生 赵政
    2001(4):18-20.
    [Abstract](963) [HTML](191) [PDF 121.75 K](369) [Cited by](14)
    Abstract:
    通过总结多年来的施工经验,针对目前国内旋挖钻机的类型和使用状况,提出了一些存在的问题,进行了分析探讨,并对设备选型提出了建议.
    3  The Development and Application of Rotary Digging Technology and Equipment in China
    周红军
    2003, 30(2):11-14,17.
    [Abstract](1088) [HTML](174) [PDF 692.58 K](152) [Cited by](12)
    Abstract:
    简述了我国旋挖钻进技术的发展概况及旋挖钻进设备及技术的优点、旋挖钻进施工过程中容易发生的事故及解决措施,分析了旋挖钻进技术发展的制约因素,同时认为目前是我国发展旋挖钻进技术的大好时机。
    4  Study on the Parameters of Pile Soil Contact Surface Element
    XU Hong fa WU Hua jie GUO Shao ping LIAO Tie ping
    2002(5):10-12.
    [Abstract](2594) [HTML](184) [PDF 204.22 K](666) [Cited by](11)
    Abstract:
    The anti uplift performances of pile are closely related to character of the contact surface. The correct selection of the mechanics parameters of contact surface has an important role in the analysis of the anti uplift theory of pile. According to the point surface contact model of pile soil contact surface and Coulomb's friction deformation principle, the value about the pile soil contact surface friction parameters are presented based on the test analysis of ten groups soil structure (steel, concrete) shear friction and conclude that the results will have important reference value for the correct value of pile soil contact surface mechanics parameters.
    5  Preliminary Analyses on the Regularity of Subsidence around the Foundation-pit
    JIANG Chen guang FAN Hao zheng GAI Yu song
    2002(6):5-6.
    [Abstract](999) [HTML](178) [PDF 108.31 K](325) [Cited by](11)
    Abstract:
    Based on a great deal of practical observation data, the article points out the primary factors causing the surface subsidence around the foundation pit. The estimate formula of surface subsidence around the foundation pit was given.
    6  Some Problems on Pneumatic DTH Drilling
    LIU Jia-rong WANG Jian-hua WANG Wen-bin XU Llu-wan
    2010, 37(5):40-44.
    [Abstract](6813) [HTML](209) [PDF 0.00 Byte](4709) [Cited by](11)
    Abstract:
    Pneumatic DTH drilling technology has been widely applied because of its high drilling efficiency and good borehole quality, but there are still some problems such as mismatch between equipment performance and construction conditions, unfitting to the main parameters and notenough mastering of operation rules. Based on the engineering practice and according to the related literature, the paper discussed the technical issues in DTH drilling.
    7  Drilling Procedure Control and Sampling of Gas Hydrates
    JIANG Guo sheng WANG Rong jing LI Zhong wen TANG Feng lin
    2001(3):33-35.
    [Abstract](960) [HTML](184) [PDF 149.13 K](289) [Cited by](10)
    Abstract:
    The ability conditions for gas hydrates and their effects on drilling process were analyzed. The control strategy of mud and the techniques of sampling and/or coring used in gas hydrate drilling also were discussed. Meanwhile the pressure core sampler used by ODP was introduced.
    8  Industrial Test Research on SmartMag Target-hitting Guidance System
    HU Han-yue XIANG Jun-wen LIU Hai-xiang CHEN Jian-yao
    2010, 37(4):6-10.
    [Abstract](2305) [HTML](178) [PDF 0.00 Byte](1877) [Cited by](10)
    Abstract:
    Built with a magnet beacon sub, a magnetic signal acquisition unit, a magnetic sensor probe and a set of professional analysis software, SmartMag target-hitting guidance system interprets the geometry position correlation between the drilling bit and the sensor set in the target borehole and finally guides the drilling reaching or avoiding the target area. The paper introduced industrial test trial on SmartMag targethitting guidance system. Based on the earlier researches, the successful operation results have been achieved during the practical test trial of the system.
    9  Overview on Drilling Construction Progress in Wenchuan Earthquake Fault Scientific Drilling Project
    ZHANG Wei JIA Jun HU Shi-you FAN La-sheng
    2012, 39(9):1-5.
    [Abstract](1118) [HTML](161) [PDF 0.00 Byte](1605) [Cited by](10)
    Abstract:
    The paper introduces the drilling operation of Wenchuan earthquake fault scientific drilling project, including drilling progress, technical problems encountered while drilling with the corresponding measures and the achievements obtained during drilling operation.
    10  BWZ-250 Pump Foam Booster
    Zhang Zupei Sun Youhong
    1997(6):2-4.
    [Abstract](1097) [HTML](198) [PDF 222.95 K](348) [Cited by](9)
    Abstract:
    The structure and working principle of BWZ-250 pump foam booster are described and it can provide a pressure increase of 5. 0 MPa with satisfactory pump rate and volumeric efficiency upto 0. 9. It is reasonable and economical to carry out foam drilling with low pressure compressor. Good results have beenachieved in three mines.
    11  Causes for Bit Freezing of Auger Drill and Its Countermeasure
    侯再民
    2001(1):13-14.
    [Abstract](930) [HTML](236) [PDF 87.32 K](360) [Cited by](9)
    Abstract:
    卡钻是旋挖钻机施工中易出现的、危害较大的事故之一。根据工程经验,分析了卡钻的原因,总结了预防及处理措施。
    12  Experience on Application of SmartMag High Precision Drilling Guidance System
    CHEN Jian-yao HU Han-yue
    2011, 38(4):10-12.
    [Abstract](2148) [HTML](202) [PDF 0.00 Byte](1825) [Cited by](9)
    Abstract:
    Developed independently by Institute of Exploration Techniques, SmartMag high precision drilling guidance system can substitute the similar imported instrument. After being tested thousands of times on the ground surface, SmartMag was brought to the construction site in Turkey for its first industrial test in 2009. In the 23 intersected wells, the systematic function of SmartMag target hitting performed well with high precision and played an important role in connecting guidance of intersected well. The paper introduced the structural principle and technical parameters, and summed up the application experience and technique of SmartMag system.
    13  Drilling Technology in WFSD-2 of Wenchuan Earthquake Fault Scientific Drilling Project
    JIA Jun LI Xu-dong FAN La-sheng DUAN Xiao-qing
    2012, 39(9):6-11.
    [Abstract](1354) [HTML](180) [PDF 0.00 Byte](1667) [Cited by](9)
    Abstract:
    This paper introduces the key drilling technology used in WFSD-2, including half-open core barrel coring technology, moving casing technology, down hole motor coring technique and drilling fluid technology. Several major accident management processes are summarized also.
    14  High Pressure Jet-grouting Used for Vertical Control of Seepage Through Dam Foundations
    ZHANG Jin chang SONG Zhi bin YANG Da gen WANG Nian you
    2000(5):29-32.
    [Abstract](1030) [HTML](182) [PDF 163.54 K](292) [Cited by](8)
    Abstract:
    Since the flood in 1998, the engineering to control the seepage though dam foundations have increased rapidly, varieties of technical method concerned are widely used. High pressure jet grouting is one of these methods. The article discribed the different behaviours and shortcomings of these methods. The application status, application ranges, mechanism of seepage prevention, technical parameters, using techniques and the inspection methods of quality for the high pressure jet grouting technique are stressed.
    15  The Application of the Drilling Fluid in the Natural Gas Hydrates Drilling
    邱存家 陈礼仪 朱宗培
    2002(4):36-37.
    [Abstract](1118) [HTML](165) [PDF 101.44 K](457) [Cited by](8)
    Abstract:
    在参阅大量天然气水合物钻探方面的技术文献资料的基础上 ,对天然气水合物钻探中钻井液的使用作了归纳和总结 ,目的在于借鉴他人成功和失败的经验教训 ,为我国今后开展这方面的研究工作做一些技术信息方面的铺垫 ;还结合国内钻井液研究现状 ,提出了我国对天然气水合物钻探钻井液研究的几点建议
    16  Thoughts on Sustainable Development in Exploration Engineering
    LIU Guang-zhi
    2007, 34(5):1-4.
    [Abstract](875) [HTML](184) [PDF 235.78 K](1415) [Cited by](8)
    Abstract:
    在综合分析我国交通基础建设(包括公路、铁路、城市轨道交通)、天然气、海洋固体矿产以及国际冰川和冻土钻探方面的形势和进展情况的基础上,提出了我国探矿工程队伍如何抓住良机、实现可持续发展的建议。
    17  Construction Technology of Well H024U and the Technical Measures of Accurate Target Hitting
    LONG Dong ZHANG Xin-gang YUE Gang XIANG Jun-wen HU Han-yue LIU Zhi-qiang
    2011, 38(3):5-8,12.
    [Abstract](2835) [HTML](193) [PDF 0.00 Byte](1959) [Cited by](8)
    Abstract:
    The horizontal well H024U is used to connect the first and the second target-vertical well V024 and V024U. The advanced construction technology of brine mining connection well and the magnetic measurement guiding system with high technology content & independent intellectual property right manufactured by the Institute of Exploration Techniques (achievement of geological investigation project) were adopted in the construction. Based on the construction experience of horizontal wells in Turkey, the drilling parameters were carefully designed and controlled, accurate target hitting was realized with hitting the production casing bottom of V024U to realize the accurate well connection.
    18  Discussion of Cavity Development in the Target Area of Intersection Well Pair
    HU Han-yue
    2014, 41(7):20-23.
    [Abstract](975) [HTML](216) [PDF 0.00 Byte](1379) [Cited by](8)
    Abstract:
    As the applications of drilling mining technology are extended from petroleum and salt well to trona solution and CBM mining industries, the thin or weak ledges can provide only a smaller target area, which makes the target-hitting more and more difficult. Different kinds of ranging technology depend on different size of target cavities so as to realize the connection between the drilling well and target well. In this paper, the analysis is focused on the deviation errors produced by MWD and rotary magnet ranging system, and the appropriate size of the cavity development is proposed.